RAD I PROJECT #14-14 RENOVATIONS
to George W. Buckner Towers

Modernization of 108 units located in a 7 story High Rise. Located at 717Cherry Street, Evansville, IN (IN36P0160067)

1.1 Summary of Work:

     
  1. Install a new Geo-thermal HVAC system.  
  2.  
  3. Remove existing Sanitary Sewer Risers and replace with PVC. (25 Risers, 25 @ 60’)  
  4.  
  5. Remove damaged brick panels on exterior. (48)  
  6.  
  7. Install new kitchen cabinets and counter tops. (108 Total)  
  8.  
  9. Install new acoustical ceiling tile and grid in all units and corridors.  
  10.  
  11. Remove carpet. (47 units)  
  12.  
  13. Install new VCT and Vinyl base in units and corridors. (90 units)  
  14.  
  15. Paint all walls, door frames, and ceilings in all locations.  
  16.  
  17. Install new latch handle door hardware throughout.  
  18.  
  19. Install new metal entry doors from corridor into units and in all common areas. (113 doors)  
  20.  
  21. Install new signage on entry doors. (113)  
  22.  
  23. Prime and paint exterior steel doors to balconies (114)  
  24.  
  25. Caulk and paint all exterior door frames at balconies. (114)  
  26.  
  27. Extend railing height to 42” at all balconies and paint all exterior railings. (114)  
  28.  
  29. Repair concrete damage at balconies. (50)  
  30.  
  31. Install new energy star refrigerators in all units.(108)  
  32.  
  33. Install new hollow core swinging doors at all current accordion door locations. (250)  
  34.  
  35. Add walls and new hollow core doors at electric panels. (78 Units)  
  36.  
  37. Demolish kitchen walls, to “open up” cabinet areas. (54 Units)  
  38.  
  39. Add exhaust hood at range. (108 units)  
  40.  
  41. Install new light fixtures in all room in all units.  
  42.  
  43. Add GFI receptacles near sinks and relocate receptacles directly over sinks.  
  44.  
  45. Install new smoke and carbon monoxide detectors in bedrooms and halls in all units. (186)  
  46.  
  47. Install new Fire Alarm panel. (1)  
  48.  
  49. Install new fire alarm pull stations in corridors. (12 - on floors 2-7)  
  50.  
  51. Build new fire rated wall enclosure at trash chute. (6 - on floors 2-7)  
  52.  
  53. Replace all electrical switches and receptacles in corridors and units.  
  54.  
  55. Install new flooring in elevators. (2)  
  56.  
  57. Add new lettering to the building sign.  
  58.  
  59. Cut sidewalk at entry and add drainage for downspouts.  
  60.  
  61. Remove existing asphalt parking area for geo-thermal wells, reinstall and re-stripe. (18,750 s.f.)  
  62.  
  63. Rework landscaping at entry.  


1.2 WORK RESTRICTIONS
A. Contractor’s Use of Premises: During construction, Contractor will have full use of site indicated. Contractor’s use of premises is limited only by Owner’s right to perform work or employ other contractors on portions of Project.
B. Owner will occupy units. Contractor is to coordinate with owner.

*Work items listed above are subject to change.